Residential New Construction

 

New Home Construction-single family dwelling.

After many meetings & design changes, project is ready to start. 

 

Excavation is a challenge due to high water level.

 

 

Sump pump system installed to keep basement dry.
With excavation for footers completed stone is placed & footers are ready for walls.
Wall forms are in place for poured concrete.
With concrete poured, project can move ahead. Forms will be stripped, steel beams will be placed & preparation for framing will take place.
With wall forms removed, steel beams & stone are in place.
Joist & deck for 1st floor.  Conventionally framed with 2 x 10 on 12-inch centers.
Exterior framework, interior partitions, roof sheathing applied, overhangs rough-in & windows being installed, project moves along smoothly.  
Interior work is taking shape to place drywall.
Please check back for updates!

 
Return to "Services" listing

 


© 2011 Trade Masters, Inc.  All rights reserved.
Trade Masters Inc.  291 Beech Road - Mohnton, PA 19540 - (610) 856-1298 - info@trademastersinc.net

Pennsylvania Home Improvement Contractor # PA013019